AI Data Centre Power Commitments. A Running Record.

Power is now the binding constraint on AI capacity. Not chips, not capital, not land. The grid decides how much can actually be built, and the commitments below are how the industry is answering that.

This is a running record of announced AI data centre power commitments, tracked in megawatts so the figures are comparable. Each announced power purchase agreement, generation deal and utility partnership that reaches gigawatt scale is recorded with its date and its primary source. Every figure was confirmed against the named source before it was listed here. Where a publisher blocks automated checking, the figure is marked as verified through a second source.

80.4 GWtotal announced across 25 commitments

25 commitments, and the pattern inside them

Announced Company Partner Capacity Source
2024-05-01 Microsoft Brookfield Asset Management 10.5 GW Brookfield source
2024-09-20 Microsoft Constellation Energy 835 MW Constellation Energy source
2024-10-14 Google Kairos Power 500 MW Kairos Power source
2024-10-16 Amazon X-energy 5 GW X-energy verified via second source source
2025-02-26 CoreWeave Core Scientific 590 MW Core Scientific verified via second source source
2025-06-03 Meta Constellation Energy 1,121 MW Constellation Energy source
2025-06-11 Amazon (AWS) Talen Energy 1,920 MW Talen Energy verified via second source source
2025-08-18 Google Kairos Power, TVA 50 MW Kairos Power source
2025-09-22 OpenAI NVIDIA 10 GW NVIDIA source
2025-09-23 OpenAI Oracle, SoftBank 10 GW OpenAI verified via second source source
2025-09-25 Fermi America Siemens Energy 1.1 GW Fermi America source
2025-10-13 OpenAI Broadcom 10 GW Broadcom verified via second source source
2025-10-28 Google NextEra Energy 615 MW NextEra Energy source
2026-01-09 Meta Oklo, Vistra, TerraPower 6.6 GW Meta source
2026-03-11 xAI Mississippi DEQ 1.2 GW Data Center Dynamics source
2026-04-27 Oracle BorderPlex, Bloom Energy 2.45 GW Oracle source
2026-06-22 Microsoft Chevron, Engine No. 1 2.67 GW Chevron source
2026-06-22 Microsoft Chevron 2 GW Microsoft source
2026-07-13 Meta State of Louisiana 5 GW Louisiana Economic Development source
2026-07-22 AMD Anthropic 2 GW AMD source
2026-07-25 NVIDIA NAVER, Brookfield 200 MW NVIDIA source
2026-07-28 AMD Core Scientific 2.5 GW Core Scientific source
2026-09-09 Google Fortum 507 MW Fortum source
2026-09-16 Anthropic Zerra DC, Macquarie, ADC 2.16 GW Reuters, iTnewsverified via second source source
2026-09-14 Bell Canada Government of Saskatchewan 900 MW Bell Canada source

What the tally actually says

Three things fall out of the list once it is sorted by date. First, the shift from buying power to owning generation. The early entries are agreements to purchase renewable output. From 2025 onward they are nuclear restarts, gas plants and fuel cell microgrids built for a single customer, which is a different kind of commitment and a much longer one.

Second, the deals are getting bigger faster than they are getting more numerous. The largest single commitments now exceed 10 GW, which is more generating capacity than many countries hold in total.

Third, the counterparties changed. Utilities and independent power producers led in 2024. By 2026 the same deal is as likely to be signed by a chip vendor, a private equity firm or a state government. Power procurement stopped being a facilities decision.

Method and limits

Included are signed or formally announced commitments stated in megawatts or gigawatts. Rumoured and reported-as-possible projects are excluded. Where sources disagree, the lower figure is recorded. Capacity figures are the announced commitment, not delivered capacity, and several of these projects run to 2030 and beyond.

Corrections are welcome and will be applied with the source attached. If a figure here is wrong, it should be wrong with its evidence visible rather than quietly.

Last updated 2026-09-17. 25 commitments tracked.